SI · Integrated Control · Audio

Studio Lounge Projector and 250" Screen

Video and audio equipment installed in a studio lounge.

  • Storming LabsClient
  • SeoulRegion
  • Integrated Control · AudioField
  • SICategory

OVERVIEW

Project Scope

Video and audio equipment installed in a studio lounge. We installed a wide 250-inch large screen, a 6000 ANSI lumen projector, wall-mounted speakers, a 4-channel power amplifier, a rack case for equipment storage, and more.

PROJECT INFO

Client
Storming Labs
Industry
Services
Region
Seoul
System
Integrated Control · Audio · AV System
Category
SI
Installation
EZWORKS Technical Team

PROJECT RECORD

Site Records

A photo record of the installation process and the completed project.

View Original Site Record · Progress · Completion — 1 photoCollapse original site record
Studio Lounge Projector and 250" Screen — Progress · Completion Photos (Vertical Collage)

Construction · Completed photo · Click to view full size in a new window

CONTACT

Inquire About a Similar Project

Tell us your installation space · purpose · and budget, and we will reply with a proposed configuration and quote based on this case. Site-visit estimates are free.